Description
Rubber Lined Pipe & Polyurethane Lined Steel Pipe
Rubber Lined Pipe Summary
1, Carbon Steel Pipe As Framework,
2, High Wear Resistant Rubber, Corrosion Resistant Rubber, High Temperature Resistant Rubber As Rubber Lining
3, High-Performance Adhesives For Rubber Lining On the Steel Pipe Inner.
4, Surface should be Anti corrosive spray paint
5, Wear Resistant vulcanized rubber For Lined Pipe Working Time Always above 10Years
6, Rubber Lined Pipe For Iron Ore Mine Tailings Mining Slurry Pipe
7, Rubber Lined Fitting For Sea Water Dredging pipe
8, Rubber Lined Spool Work For electric-power plant factory industry Desulfurization Pipe
9, Rubber Lined Framework For chemical plant factory Sewage Pipe
Rubber Line Materials:
Natural Rubber,Poly Urethane Rubber,Butyl Rubber,Nitrile Butadiene Rubber,Chloroprene Rubber,Hypalon Rubber,Ethylene Propylene Rubber,Styrene Butadiene Copolyme Rubber,Synthetic Rubber,Abrasive Rubber,Anti Corrosive Rubber,Acid Resistant Rubber,Alkali Resistant Rubber,Salt Resistant Rubber,High Temperature Resistant Rubber,Oil Resistant Rubber,Vulcanized Rubber,Pre Vulcanized Rubber
Rubber Lined Piping Method:
There are two Method of rubber lined piping: heat vulcanizing Rubber Lined Pipe method and Rubber Line bonding inner Steel Pipe method.
Heat vulcanization bonding Rubber Lined Pipe
Through vulcanization Tank, under high temperature and high pressure, Making the rubber vulcanization bonding on Steel Pipe Inner Surface.
♠ Allow the rubber line to be vulcanized
♠ Bond the rubber line to the inner surface of the Steel Piping Spool Work by heat vulcanizing.
Rubber Line bonding For Rubber Lined Pipe method
♠ Through the special vulcanizing adhesive,
♠ Making rubber line direct bonding,
♠ After bonding, Then the Rubber lined Pipe can be used directly
Rubber Lined Pipe And Fitting Feature:
♣ High wear resistance: Impact resistance
♣ High strength: Good Anti-abrasion, Effectively avoid damage caused by water hammer
♠ High corrosion resistance: Fine Anti-corrosion
♣ Acid resistance, alkali resistance, corrosion resistance
♣ Prevent chemical damage to steel Pipe Skeleton Frame
♣ Slowing down fouling
♣ Adhesion of Rubber Lined Steel Pipe is very strong
♣ Less running resistance can reduce energy consumption;: Transmission medium resistance is very small
♣ Can be transported by a wide variety of fluid media
♣ Working Service life can be up to 15~50 years
♣ Energy saving, environmental protection, high efficiency
♣ High temperature resistance: Adapting to wide range of temperature: Working temperature: -50℃~+150℃
♣ Main transport medium:wear and corrosive medium Slurry medium
♣ Can reduces the impact abrasion of the conveying medium on the steel Pipe Skeleton Frame wall
♠ Light weight, easy to install, maintain and transport;
♠ Recycling and reusing.
Carbon Steel Pipe Rubber Lined Process:
Carbon Steel Pipe Frame Sand Blasting :
♥Sand Blasting On Carbon Steel Pipe Framework Inside and Outside
♥Make sure Both side about Pipe Framework Clean
♥Surface Roughness Of The Inside about Carbon Steel Pipe Skeleton Frame be 45~75 Microns.
Carbon Steel Pipe Framework Surface Degreasing :
♥Put The Sand Blasting Steel Pipe Frame On The Work Table,
♥Use Oxalic Acid Clean Surface Of Carbon Steel Pipe Frame Which place need to be Rubber Lined.
Making Adhesive On Surface Carbon Steel Pipe :
♥After Surface Degreasing 5~10 Minutes, Apply Adhesive A,
♥After Make Sure Adhesive A Be Dry, Apply Adhesive B.
Making Rubber Liner For Rubber Lined Pipe :
♥Preheat Rubber Plate,
♥Use Rubber Extruder Finished The Rubber Lined.
Making Rubber Plate Lined on Carbon Steel Pipe:
♥Clean Surface Of Rubber Plate With Oxalic Acid,
♥After Rubber Plate Surface Dry, Making Adhesive On The Surface Of Rubber Plate.
Rubber Lined Pipe Vulcanization :
♥Put The First Step Rubber Lined Piping Into The Vulcanization Tank To be Vulcanization.
Rubber Lined Pipeline Inspection :
♥Test All Adhesive Surfaces By High Voltage Spark Tester.
♥Make Sure All The Rubber Plate With Steel Pipe Skeleton Frame Are Well Bonded
♥There Is No Missing Place without be Adhesive be Bonded.
♥ There Is No Rubber Lined Pipe Missing Plac

